国产精品无码V在线观看,成人片黄网站A片免费,人狗胶配方大全高清4,和子发生了性关系的免费视频

歡迎光臨山東墨源數(shù)控設(shè)備有限公司官網(wǎng)為您提供:保麗龍雕刻機(jī),五軸保麗龍刻機(jī),四軸保麗龍雕刻機(jī)

業(yè)內(nèi)資訊 當(dāng)前位置:首頁(yè) - 新聞中心 > 業(yè)內(nèi)資訊

雕刻機(jī)水冷主軸電機(jī)水路堵住了怎么辦

來(lái)源:http://m.yjozone.com 時(shí)間:2021-05-19 

木工雕刻機(jī)在加工過(guò)程中,由于水冷主軸的工作特性決定。會(huì)出現(xiàn)雕刻機(jī)主軸被堵的情況。由于雕刻機(jī)主軸電機(jī)是水冷主軸,一定靠?jī)?nèi)部循環(huán)水來(lái)反復(fù)循環(huán),以達(dá)到工作過(guò)程中將主軸電機(jī)熱量降低的目的。從而使得雕刻機(jī)能正常穩(wěn)定的工作。雕刻機(jī)主軸如果不及時(shí)更換冷 卻水,會(huì)導(dǎo)致雕刻機(jī)主軸產(chǎn)熱高,從而使得雕刻精度降低,甚出現(xiàn)丟步,錯(cuò)位的情況。
In the process of woodworking engraving machine, because of the working characteristics of water-cooled spindle. The engraving machine spindle will be blocked. As the engraving machine spindle motor is water-cooled spindle, it must rely on internal circulating water to cycle repeatedly, in order to achieve the purpose of reducing the heat of the spindle motor in the working process. So that the engraving function can work normally and stably. If the main shaft of engraving machine is not replaced with cooling water in time, it will lead to high heat production of the main shaft of engraving machine, which will reduce the engraving accuracy, and even lead to step loss and dislocation.
所以雕刻機(jī)主軸電機(jī)如果出現(xiàn)堵了的情況,應(yīng)該及時(shí)解決。,可以接上氣泵吹下,將水管內(nèi)的雜物,堵塞物,試著吹出。如果吹不出,也可以用稀釋的酸液浸泡下,將堵塞物軟 化后,再用高壓水槍吹下,將里面的水垢和雜質(zhì)吹出。
保麗龍雕刻機(jī)
So if the engraving machine spindle motor is blocked, it should be solved in time. First of all, you can connect the air pump to blow down and try to blow out the debris and blockage in the water pipe. If it can not be blown out, it can also be soaked in diluted acid to soften the blockage, and then blow it down with a high-pressure water gun to blow out the scale and impurities inside.
木工雕刻機(jī)主軸既然容易堵塞,那么平時(shí)雕刻機(jī)用戶(hù)在使用過(guò)程中應(yīng)該做到,盡量用干凈的冷 卻水來(lái)作為主軸冷 卻循環(huán)水。不要圖便宜省事而選用雜質(zhì)太多的,污濁的水。另外,做到勤更換冷 卻水,不要等水燙手了,再來(lái)更換.
Since the main shaft of woodworking engraving machine is easy to block, the engraving machine users should try to use clean cooling water as the main shaft cooling circulating water. Don't try to save money and choose too much impurity, dirty water. In addition, do frequently change the cooling water, do not wait for the water hot, and then change
如果上述辦法沒(méi)有解決主軸電機(jī)的堵塞問(wèn)題,一般可以選擇更換 新的主軸電機(jī),大家可以聯(lián)系我們選擇購(gòu)買(mǎi),我們公司會(huì)提供優(yōu)良的產(chǎn)品和售后服務(wù)。
If the above methods do not solve the problem of spindle motor blockage, you can generally choose to replace the new spindle motor, you can contact us to choose to buy, our company will provide excellent products and after-sales service.